A successful commercial rubber dam project requires precise civil engineering and expert installation. Our comprehensive 16-step construction process guides contractors through every critical phase—from initial foundation excavation, concrete pouring, and bottom plate completion, to dam bladder hoisting and rigorous bolt tightening. As a direct manufacturer, we ensure all custom OEM dam bags are fabricated to exact design blueprints and undergo strict factory inspections prior to site delivery. Partner with our engineering team for industrial-grade water control solutions, complete technical installation support, and bulk project pricing.
  • Detailed Description

The construction process for a rubber dam primarily involves two key aspects: first, civil engineering works; and second, the custom fabrication of the rubber dam bag. (1) Civil Engineering Works: Civil engineers are responsible for ensuring that all prerequisites for the rubber dam's construction are met. The specific civil engineering tasks involved mainly include excavating the foundation pit and embedding the necessary control and monitoring pipelines. (2) Custom Fabrication of the Dam Bag: When commissioning the dam bag, it is advisable to consult multiple manufacturers. A thorough analysis of their past performance and reputation should be conducted to ensure the quality of the dam bags; particular emphasis should be placed on verifying whether they hold state-issued product quality certificates and comprehensive quality inspection reports for the dam bags. Prior to production, the dam bag and its accompanying base gaskets must be manufactured in strict accordance with the design drawings. Upon completion and before leaving the factory, a rigorous inspection must be performed to ensure that all dimensions and specifications meet the design requirements.
When broken down into finer detail, the comprehensive construction process for a rubber dam consists of 16 distinct operational steps:

1. Foundation arrangement of bolt and lower clamping plate 

21

2. Concrete pouring

221

3. Complete upstream bottom plate

121

4. Complete downstream bottom plate

43

5. Concrete bottom plate completed Expanse bottom gasket 

231

6. Drilling

1112

7. Waterstop in place

431

8. Dam bladder hoisting

323

9. Unfold dam bladder

2212

10. Dam bladder unfolded in place

54

11. Tighten bolts

88

12. Installation completed

77

13. Apply butter to protect bolts

66

14. Plastic bag protection

14

15. Protect clamping plate bolt by concrete

15

16. Rubber dam when completed

16

A clearer and more detailed version is attached:

Pillow Dam Installation and Construction Specifications.PDF

Ready to Start Your Water Retaining Project?

Get direct access to factory pricing, detailed technical specifications, and end-to-end execution plans from our manufacturing base.

Established in 1975, HuaMing Tech is a leading manufacturer specializing in flexible water retaining systems. We deliver innovative, durable rubber dams and pneumatic shield gates for global water conservancy projects, providing end-to-end turnkey solutions.

Contact Us ——

Address: No. 700 Haixi Road, Huangdao District, Qingdao City, Shandong Province, China

Phone/WhatsApp: +86-139-6968-7567

Fax: +86-532-86115809

Email: web@inflatabledam.cn

© 2026 Qingdao Huaming Industrial Technology Co., Ltd. All Rights Reserved. 

online service

Hello, I am the online customer service

X